How does DBA handle job scheduling?

Without formal jobs with scheduled start dates, in light manufacturing systems you must manually determine when assembly builds can be started and in what order.

By contrast, in DBA a master job schedule is generated by MRP whereby supply dates are coordinated with dependent demand dates. Jobs are automatically rescheduled if needed when they are released to production based on material availability.